Engineering

Utility

The client’s Control Room building was cooled by a chilled water system that utilized a pair of redundant cooling towers. These towers were approaching End-of-Life. Repairs were becoming frequent and replacement parts hard to find.

Scion Health

To address Scion Health’s Corporate Data Center’s problematic switchgear we installed a temporary electrical distribution system. While in place, this temporary gear allowed the switchgear work to occur without loss of operation in the Data Center.

Construction

Utility

The client’s Control Room building was cooled by a chilled water system that utilized a pair of redundant cooling towers. These towers were approaching End-of-Life. Repairs were becoming frequent and replacement parts hard to find.

Scion Health

To address Scion Health’s Corporate Data Center’s problematic switchgear we installed a temporary electrical distribution system. While in place, this temporary gear allowed the switchgear work to occur without loss of operation in the Data Center.

Facilities Management

Utility

The client’s Control Room building was cooled by a chilled water system that utilized a pair of redundant cooling towers. These towers were approaching End-of-Life. Repairs were becoming frequent and replacement parts hard to find.

Maintenance

Safelite

TechSite serves as the single point of contact for all facilities.

Design-Build

Utility

The client’s Control Room building was cooled by a chilled water system that utilized a pair of redundant cooling towers. These towers were approaching End-of-Life. Repairs were becoming frequent and replacement parts hard to find.

Scion Health

To address Scion Health’s Corporate Data Center’s problematic switchgear we installed a temporary electrical distribution system. While in place, this temporary gear allowed the switchgear work to occur without loss of operation in the Data Center.